Print Print  
Award Information
Proposal Number: 0822003
Proposal Title: Spray-on Treatments for Critical Infrastructure Protection
Topic Number: H-SB08.2-001
Phase: Phase II
Topic Title: Engineered Building Materials
Organization: Resodyn Corporation
Address: 130 North Main Street
Suite 600
Butte, MT 59701-9314  
Abstract: The success of a Phase I research effort has compelled Resodyn Corporation to submit a Phase II proposal based on an engineered materials approach for preventing, or mitigating the damage caused primarily by blast with some application for projectile, and fire damage. The proposed Spray-on Treatments for Engineered Protection (STEP) system allows flexibility in both the design of the coating and the application. Sprayable material systems are proposed that have demonstrated blast, projectile and fire protection potential. The spray-on application capability allows for conformal coatings of complex geometries. The STEP process holds the promise of economical, moderate level blast, projectile, and fire protection for a great number of the Nation`s critical infrastructures.
Award/Contract Number: N10PC20041
Period of Performance: 03/15/2010 - 06/30/2014
Award/Contract Value: $958,000.00
Award/Obligated Amount: $958,000.00